How much do aluminium windows and doors cost in the UAE?
Pricing varies significantly based on system type, size and specification. As a guide, a standard villa window replacement programme typically ranges from AED 80,000 to AED 250,000+ depending on the number of openings and system selected. Lift-and-slide door systems start from AED 12,000–18,000 per opening. On a per-sqm basis, casement windows start from around AED 800/sqm and lift-and-slide systems from AED 2,000/sqm installed. We provide detailed fixed-price quotations after a site survey — contact us to arrange one.
Pricing
Why is Cortizo more expensive than other aluminium systems?
Cortizo is a Spanish manufacturer with over 50 years of engineering investment. The price difference reflects precision-extruded thermal breaks, European hardware from Roto and Maco, and performance credentials independently tested to EN standards. In our experience, the long-term cost of a premium system — factoring in maintenance, hardware longevity and energy savings — is substantially lower than a cheaper alternative replaced in 5–7 years.
Pricing
Do you offer financing or payment plans?
We work with clients on structured payment schedules tied to project milestones — typically deposit on order, payment on delivery, and balance on installation completion. We can discuss terms that suit your project cashflow during the quotation process.
General
How long does a typical installation project take?
Lead times vary by project scope and system complexity. A typical villa window and door replacement takes 6–10 weeks from survey to installation completion. Larger projects or custom sizes may require 12–16 weeks. We provide precise timelines at quotation stage.
General
How long does manufacture take after order confirmation?
Standard Cortizo and Gulf Extrusions systems typically have a 4–6 week manufacturing lead time from confirmed order. Bespoke sizes, unusual configurations or powder coat colours outside the standard range may add 1–2 weeks. We always confirm the exact lead time in your contract.